The prototype design documents were developed for Cy-Fair center and were site-adapted for Conroe, Victory, and Atascosita campuses. Each one of these buildings is approximately 65,000 SF with 75% of programmed space for classrooms, computer labs, faculty offices; and 25% of programmed space for industrial high-bay for hands-on work force training. Work force program for campuses differ in type and size, but includes wood working, metal shops, air conditioning repair, electronic repairs, and welding.