• Francis_1
  • Francis_2
  • Francis_3
  • Francis_4
  • Francis_5
  • Francis_6
  • Francis_7
  • Francis_8

Francis Hall is located in the Historic Core of Texas A&M University. It is desired that this building continue to be seen by students, visitors and the University community as an important part of the overall University identity. The Mark Francis Hall, named in honor of the first Dean of the School of Veterinary Medicine, was constructed in 1922. It is one of the original campus buildings and reflects definitive campus architectural features, including brick pilasters which extend through the first and second stories, and are crowned with both Ionic and Doric capitals. This building contains 36,850 square feet of area and four levels of office, classroom, and support space. There are three levels above grade.

The Capital Renewal of Francis Hall re-purposed the facility for use by TAMU’s Department of Construction Science. Spaces include classrooms, an auditorium, bid room mock up suite, Building Information Modeling (BIM) lab, continuing education center, job trailer mock up, museum of construction/building, student competition leadership suite, student lounge, safety and specialty labs, industry relations suite, and faculty offices.

This project accomplishes the needed improvements required to address the architectural needs of the occupants, the regulatory requirements related to the Texas Accessibility Standards (TAS), mechanical/electrical/plumbing upgrades of outdated systems, Fire and Life Safety (F&LS) code upgrades, waterproofing improvements to the building envelope, the deferred maintenance identified as needed in the building, as well as a needed vertical access to floors above.

BRW Architects validated the existing Program of Requirements and analyze the space relationships, evaluate alternative solutions, and developed these into conceptual presentations with recommendations as to those solutions that provide advantageous operational features. BRW met with the User Coordinator and representatives of each department in conferences to formulate these relationships. We also worked with the User Coordinator and departmental representatives to identify donor opportunities and strategies, within the project scope, that was utilized in a Development Fundraising campaign.